ITAC Assessment: OR0056
ITAC logo
ITAC Assessment: OR0056
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product SALADS,VEGGIES,SOUR CRM.
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 52,800,000
lb
Production Hrs. Annual 6,552
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,982 2,599,062
kWh
Natural Gas $106,495 23,453
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,093

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $252 - $252
5,275
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,873 $100 - $2,873
-
MMBtu
-
03 3.4151: Minimize water usage $3,946 $1,683 - - $3,946
04 2.1232: Keep boiler tubes clean $1,821 $100 - $1,821
-
MMBtu
-
05 2.1213: Direct warmest air to combustion intake $377 $310 - $377
-
MMBtu
-
06 2.2441: Preheat boiler makeup water with waste process heat $3,201 $2,750 - $3,201
-
MMBtu
-
07 2.3212: Optimize plant power factor $294 $750 $294
-
kWh
- -
TOTAL RECOMMENDED $12,764 $5,693 $546
5,275
kWh
$8,272
-
MMBtu
$3,946
TOTAL IMPLEMENTED $12,093 $4,633 $252
5,275
kWh
$7,895
-
MMBtu
$3,946
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs