ITAC Assessment: OR0041
ITAC logo
ITAC Assessment: OR0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MILK PRODUCTS
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area
n/a
Annual Production 18,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,412 910,903
kWh
Natural Gas $26,777 5,690
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,998 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,203

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $527 - $527
10,844
kWh
-
02 2.2163: Use minimum steam operating pressure $254 - - $254
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $949 $300 - $949
-
MMBtu
04 2.2441: Preheat boiler makeup water with waste process heat $941 $475 - $941
-
MMBtu
05 2.4133: Use most efficient type of electric motors $158 $136 $158
3,224
kWh
-
06 2.2136: Install / repair insulation on steam lines $2,075 $1,966 - $2,075
-
MMBtu
07 2.2123: Insulate feedwater tank $94 $177 - $94
-
MMBtu
TOTAL RECOMMENDED $4,998 $3,054 $685
14,068
kWh
$4,313
-
MMBtu
TOTAL IMPLEMENTED $1,203 $300 - $1,203
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs