Assessment Year | 1988 |
---|---|
Principal Product | CANNED DOG & CAT FOOD |
NAICS |
n/a
|
SIC | 2047: Dog and Cat Food |
Sales Range | $10 M to 50M |
# of Employees | 116 |
Plant Area |
n/a
|
Annual Production | 99,000,000
lb
|
Production Hrs. Annual | 5,616
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $121,586 | 2,480,363 |
kWh
|
$0.049 |
Natural Gas | $366,356 | 107,673 |
MMBtu
|
$3.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $134,106 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $125,553 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2163: Use minimum steam operating pressure | $2,098 | - | - |
$2,098
-
MMBtu
|
- | |
02 | 2.6232: Install set-back timers | $603 | - |
$603
5,569
kWh
|
- | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,267 | $300 | - |
$3,267
-
MMBtu
|
- | |
04 | 2.1213: Direct warmest air to combustion intake | $459 | $250 | - |
$459
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $944 | $236 |
$966
19,637
kWh
|
- | $(-22.0) | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $176 | $67 |
$195
3,810
kWh
|
- | $(-19.0) | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $761 | $521 |
$840
16,999
kWh
|
- | $(-79.0) | |
08 | 2.4133: Use most efficient type of electric motors | $277 | $248 |
$277
5,569
kWh
|
- | - | |
09 | 3.4115: Recover and reuse cooling water | $99,151 | $100,000 |
$(-7,796.0)
(-159,144)
kWh
|
- | $106,947 | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $219 | $172 |
$252
4,982
kWh
|
- | $(-33.0) | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $204 | $345 |
$159
3,224
kWh
|
- | $45 | |
12 | 2.2414: Use waste heat from hot flue gases to preheat | $5,996 | $17,765 | - |
$5,996
-
MMBtu
|
- | |
13 | 2.1233: Analyze flue gas for proper air/fuel ratio | $19,951 | $1,500 | - |
$19,951
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $134,106 | $121,404 |
$(-4,504.0)
(-99,354)
kWh
|
$31,771
-
MMBtu
|
$106,839 | ||
TOTAL IMPLEMENTED | $125,553 | $103,389 |
$(-4,504.0)
(-99,354)
kWh
|
$23,218
-
MMBtu
|
$106,839 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs