ITAC Assessment: OR0035
ITAC logo
ITAC Assessment: OR0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product CANNED DOG & CAT FOOD
NAICS
n/a
SIC 2047: Dog and Cat Food
Sales Range $10
M
to 50
M
# of Employees 116
Plant Area
n/a
Annual Production 99,000,000
lb
Production Hrs. Annual 5,616
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,586 2,480,363
kWh
Natural Gas $366,356 107,673
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $134,106 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $125,553

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2163: Use minimum steam operating pressure $2,098 - - $2,098
-
MMBtu
-
02 2.6232: Install set-back timers $603 - $603
5,569
kWh
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $3,267 $300 - $3,267
-
MMBtu
-
04 2.1213: Direct warmest air to combustion intake $459 $250 - $459
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $944 $236 $966
19,637
kWh
- $(-22.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $176 $67 $195
3,810
kWh
- $(-19.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $761 $521 $840
16,999
kWh
- $(-79.0)
08 2.4133: Use most efficient type of electric motors $277 $248 $277
5,569
kWh
- -
09 3.4115: Recover and reuse cooling water $99,151 $100,000 $(-7,796.0)
(-159,144)
kWh
- $106,947
10 2.7142: Utilize higher efficiency lamps and/or ballasts $219 $172 $252
4,982
kWh
- $(-33.0)
11 2.7142: Utilize higher efficiency lamps and/or ballasts $204 $345 $159
3,224
kWh
- $45
12 2.2414: Use waste heat from hot flue gases to preheat $5,996 $17,765 - $5,996
-
MMBtu
-
13 2.1233: Analyze flue gas for proper air/fuel ratio $19,951 $1,500 - $19,951
-
MMBtu
-
TOTAL RECOMMENDED $134,106 $121,404 $(-4,504.0)
(-99,354)
kWh
$31,771
-
MMBtu
$106,839
TOTAL IMPLEMENTED $125,553 $103,389 $(-4,504.0)
(-99,354)
kWh
$23,218
-
MMBtu
$106,839
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs