ITAC Assessment: OR0033
ITAC logo
ITAC Assessment: OR0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PACKAGED SEAFOOD
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area
n/a
Annual Production 29,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,760 4,177,902
kWh
Natural Gas $97,865 20,844
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,966 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,625

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $767 - $767
17,585
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,744 $300 - $3,744
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $279 $167 $279
6,448
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $575 $878 $417
9,379
kWh
- $158
05 2.7142: Utilize higher efficiency lamps and/or ballasts $260 $295 $304
7,034
kWh
- $(-44.0)
06 2.3212: Optimize plant power factor $2,051 $4,500 $2,051
-
kWh
- -
07 2.2414: Use waste heat from hot flue gases to preheat $2,290 $7,790 - $2,290
-
MMBtu
-
TOTAL RECOMMENDED $9,966 $13,930 $3,818
40,446
kWh
$6,034
-
MMBtu
$114
TOTAL IMPLEMENTED $5,625 $1,640 $1,767
40,446
kWh
$3,744
-
MMBtu
$114
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs