ITAC Assessment: OR0030
ITAC logo
ITAC Assessment: OR0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product POTATOE & CORN CHIPS
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $100
M
to 500
M
# of Employees 470
Plant Area
n/a
Annual Production 58,000,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $230,603 8,437,866
kWh
Natural Gas $1,242,039 261,393
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $138,093 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $138,093

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $763 - $763
28,136
kWh
- -
02 3.4113: Treat and reuse rinse waters $81,387 $25,000 $(-1,063.0)
(-39,273)
kWh
- $82,450
03 2.1233: Analyze flue gas for proper air/fuel ratio $228 $150 - $228
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $201 $349 $117
4,396
kWh
- $84
05 2.7142: Utilize higher efficiency lamps and/or ballasts $851 $1,879 $1,169
43,376
kWh
- $(-318.0)
06 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $50,942 $100,000 - $50,942
-
MMBtu
-
07 2.2511: Insulate bare equipment $3,721 $21,000 - $3,721
-
MMBtu
-
TOTAL RECOMMENDED $138,093 $148,378 $986
36,635
kWh
$54,891
-
MMBtu
$82,216
TOTAL IMPLEMENTED $138,093 $148,378 $986
36,635
kWh
$54,891
-
MMBtu
$82,216
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs