ITAC Assessment: OR0029
ITAC logo
ITAC Assessment: OR0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product FROZEN FRUIT
NAICS
n/a
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area
n/a
Annual Production 15,800,000
lb
Production Hrs. Annual 3,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,020 4,466,882
kWh
Natural Gas $33,484 7,083
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,559 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,559

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $5,789 $5,000 $5,789
275,791
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $914 - $914
43,376
kWh
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $3,939 $600 - $3,939
-
MMBtu
-
04 2.4133: Use most efficient type of electric motors $119 $177 $119
5,569
kWh
- -
05 2.2121: Increase amount of condensate returned $1,774 $712 - $1,646
-
MMBtu
$128
06 2.7142: Utilize higher efficiency lamps and/or ballasts $24 $51 $24
879
kWh
- -
TOTAL RECOMMENDED $12,559 $6,540 $6,846
325,615
kWh
$5,585
-
MMBtu
$128
TOTAL IMPLEMENTED $12,559 $6,540 $6,846
325,615
kWh
$5,585
-
MMBtu
$128
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs