ITAC Assessment: OR0024
ITAC logo
ITAC Assessment: OR0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product VARIOUS DAIRY PRODUCTS
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 86
Plant Area
n/a
Annual Production 33,000,000
lb
Production Hrs. Annual 2,860
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,587 1,109,027
kWh
Natural Gas $31,335 7,110
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,189 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,244

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $821 - $821
14,947
kWh
-
02 2.2621: Modify refrigeration system to operate at a lower pressure $2,315 - $2,315
42,204
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $536 $300 - $536
-
MMBtu
04 2.4133: Use most efficient type of electric motors $146 $109 $146
2,638
kWh
-
05 2.2449: Recover heat from exhausted steam, hot air or hot water $6,703 $6,353 - $6,703
-
MMBtu
06 2.2414: Use waste heat from hot flue gases to preheat $630 $1,445 - $630
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $38 - $38
586
kWh
-
TOTAL RECOMMENDED $11,189 $8,207 $3,320
60,375
kWh
$7,869
-
MMBtu
TOTAL IMPLEMENTED $8,244 $6,762 $1,005
18,171
kWh
$7,239
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs