Assessment Year | 1988 |
---|---|
Principal Product | MILK,ICE CREAM & YOGURT |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $5 M to 10M |
# of Employees | 9 |
Plant Area |
n/a
|
Annual Production | 9,400,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $48,097 | 934,936 |
kWh
|
$0.051 |
Natural Gas | $13,487 | 2,847 |
MMBtu
|
$4.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,456 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $374 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $909 | $1,200 |
$909
17,878
kWh
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $374 | $300 | - |
$374
-
MMBtu
|
|
03 | 2.2444: Use hot process fluids to preheat incoming process fluids | $2,134 | $2,191 | - |
$2,134
-
MMBtu
|
|
04 | 2.2122: Install / repair insulation on condensate lines | $400 | $644 | - |
$400
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $639 | $1,346 |
$639
4,982
kWh
|
- | |
TOTAL RECOMMENDED | $4,456 | $5,681 |
$1,548
22,860
kWh
|
$2,908
-
MMBtu
|
||
TOTAL IMPLEMENTED | $374 | $300 | - |
$374
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs