ITAC Assessment: OR0023
ITAC logo
ITAC Assessment: OR0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MILK,ICE CREAM & YOGURT
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $5
M
to 10
M
# of Employees 9
Plant Area
n/a
Annual Production 9,400,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,097 934,936
kWh
Natural Gas $13,487 2,847
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,456 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $374

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $909 $1,200 $909
17,878
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $374 $300 - $374
-
MMBtu
03 2.2444: Use hot process fluids to preheat incoming process fluids $2,134 $2,191 - $2,134
-
MMBtu
04 2.2122: Install / repair insulation on condensate lines $400 $644 - $400
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $639 $1,346 $639
4,982
kWh
-
TOTAL RECOMMENDED $4,456 $5,681 $1,548
22,860
kWh
$2,908
-
MMBtu
TOTAL IMPLEMENTED $374 $300 - $374
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs