Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MARASCHINO CHERRIES
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area
n/a
Annual Production 16,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,376 2,225,088
kWh
Natural Gas $349,061 88,560
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,456 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,504

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1212: Operate boilers on high fire setting $8,014 - - $8,014
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,700 $300 - $3,700
-
MMBtu
-
04 2.2511: Insulate bare equipment $1,572 $276 - $1,572
-
MMBtu
-
05 2.2121: Increase amount of condensate returned $36,523 $9,395 - $31,634
-
MMBtu
$4,889
06 2.2511: Insulate bare equipment $13,283 $5,026 - $13,283
-
MMBtu
-
07 2.2511: Insulate bare equipment $7,722 $7,598 - $7,722
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,690 $2,604 $953
47,773
kWh
- $1,737
09 2.3212: Optimize plant power factor $2,952 $6,720 $2,952
-
kWh
- -
TOTAL RECOMMENDED $76,456 $31,919 $3,905
47,773
kWh
$65,925
-
MMBtu
$6,626
TOTAL IMPLEMENTED $73,504 $25,199 $953
47,773
kWh
$65,925
-
MMBtu
$6,626
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs