| Assessment Year | 1988 |
|---|---|
| Principal Product | MARASCHINO CHERRIES |
| NAICS |
n/a
|
| SIC | 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
n/a
|
| Annual Production | 16,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $44,376 | 2,225,088 |
kWh
|
$0.020 |
| Natural Gas | $349,061 | 88,560 |
MMBtu
|
$3.94 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $76,456 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $73,504 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1212: Operate boilers on high fire setting | $8,014 | - | - |
$8,014
-
MMBtu
|
- | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,700 | $300 | - |
$3,700
-
MMBtu
|
- | |
| 04 | 2.2511: Insulate bare equipment | $1,572 | $276 | - |
$1,572
-
MMBtu
|
- | |
| 05 | 2.2121: Increase amount of condensate returned | $36,523 | $9,395 | - |
$31,634
-
MMBtu
|
$4,889 | |
| 06 | 2.2511: Insulate bare equipment | $13,283 | $5,026 | - |
$13,283
-
MMBtu
|
- | |
| 07 | 2.2511: Insulate bare equipment | $7,722 | $7,598 | - |
$7,722
-
MMBtu
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,690 | $2,604 |
$953
47,773
kWh
|
- | $1,737 | |
| 09 | 2.3212: Optimize plant power factor | $2,952 | $6,720 |
$2,952
-
kWh
|
- | - | |
| TOTAL RECOMMENDED | $76,456 | $31,919 |
$3,905
47,773
kWh
|
$65,925
-
MMBtu
|
$6,626 | ||
| TOTAL IMPLEMENTED | $73,504 | $25,199 |
$953
47,773
kWh
|
$65,925
-
MMBtu
|
$6,626 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs