ITAC Assessment: OR0018
ITAC logo
ITAC Assessment: OR0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product LUMBER & VENEER
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 60,000
thousand feet
Production Hrs. Annual 4,480
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $491,317 16,732,122
kWh
Wood $228,920 387,998
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,129 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,282

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,235 - $1,235
42,497
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $884 $761 $1,137
39,273
kWh
- $(-253.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,068 $1,262 $1,442
49,824
kWh
- $(-374.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,062 $1,074 $733
25,205
kWh
- $329
05 2.4133: Use most efficient type of electric motors $434 $597 $434
14,947
kWh
- -
06 2.8114: Change rate schedules or other changes in utility service $20,000 $55,000 $20,000
-
kWh
- -
07 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $7,785 $33,000 $11,325
428,195
kWh
$(-3,540.0)
-
MMBtu
-
08 2.4322: Use or replace with energy efficient substitutes $4,661 $10,500 $1,661
57,444
kWh
- $3,000
TOTAL RECOMMENDED $37,129 $102,194 $37,967
657,385
kWh
$(-3,540.0)
-
MMBtu
$2,702
TOTAL IMPLEMENTED $8,282 $13,120 $5,909
203,985
kWh
- $2,373
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs