ITAC Assessment: AM0310
ITAC logo
ITAC Assessment: AM0310
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Ice chests, canoes
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 354,100
ft2
Annual Production 10,030,000
pieces
Production Hrs. Annual 8,658
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $407,233 16,813,892
kWh
Electricity Demand $333,297 27,006
kW-mo/yr
Natural Gas $83,961 22,728
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,870

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $15,600 - - $15,600
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $6,050 $1,110 - - $6,050
-
MMBtu
03 2.4314: Use synthetic lubricant $5,890 - $3,600
150,059
kWh
$2,290
-
kW-mo/yr
-
04 2.2511: Insulate bare equipment $5,890 $2,460 - - $5,890
-
MMBtu
05 2.4133: Use most efficient type of electric motors $3,980 $10,530 $2,430
101,407
kWh
$1,550
-
kW-mo/yr
-
06 2.7124: Make a practice of turning off lights when not needed $1,060 - $1,060
23,740
kWh
- -
07 2.7135: Install occupancy sensors $590 $175 $590
24,619
kWh
- -
08 2.2511: Insulate bare equipment $430 $310 $430
17,878
kWh
- -
TOTAL RECOMMENDED $39,490 $14,585 $8,110
317,703
kWh
$19,440
-
kW-mo/yr
$11,940
-
MMBtu
TOTAL IMPLEMENTED $22,870 $14,100 $7,090
275,206
kWh
$3,840
-
kW-mo/yr
$11,940
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs