ITAC Assessment: OR0017
ITAC logo
ITAC Assessment: OR0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PUREE CONCENTRATES
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 14,000,000
lb
Production Hrs. Annual 0
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,769 2,016,706
kWh
Natural Gas $217,147 53,845
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,057 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,311

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2163: Use minimum steam operating pressure $326 - - $326
-
MMBtu
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $818 - $818
14,361
kWh
- -
03 2.2621: Modify refrigeration system to operate at a lower pressure $2,710 - $2,710
47,479
kWh
- -
04 2.2621: Modify refrigeration system to operate at a lower pressure $6,291 - $6,291
110,492
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $3,466 $300 - $3,466
-
MMBtu
-
06 2.2122: Install / repair insulation on condensate lines $150 $76 - $150
-
MMBtu
-
07 3.4115: Recover and reuse cooling water $502 $320 - - $502
08 2.4133: Use most efficient type of electric motors $276 $298 $276
4,982
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $518 $997 $582
10,258
kWh
- $(-64.0)
TOTAL RECOMMENDED $15,057 $1,991 $10,677
187,572
kWh
$3,942
-
MMBtu
$438
TOTAL IMPLEMENTED $13,311 $1,297 $9,583
168,229
kWh
$3,792
-
MMBtu
$(-64.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs