Assessment Year | 1987 |
---|---|
Principal Product | PACKAGED SEAFOOD |
NAICS |
n/a
|
SIC | 2092: Prepared Fresh or Frozen Fish and Seafoods |
Sales Range | $5 M to 10M |
# of Employees | 60 |
Plant Area |
n/a
|
Annual Production | 12,300,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $76,104 | 1,505,862 |
kWh
|
$0.051 |
Natural Gas | $28,733 | 5,974 |
MMBtu
|
$4.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,190 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,286 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $8,494 | - |
$8,494
169,695
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $389 | - |
$389
7,913
kWh
|
- | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $376 | - |
$269
5,275
kWh
|
- | $107 | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $553 | $300 | - |
$553
-
MMBtu
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $481 | $411 |
$529
10,551
kWh
|
- | $(-48.0) | |
07 | 2.4133: Use most efficient type of electric motors | $115 | $108 |
$115
2,345
kWh
|
- | - | |
08 | 2.8114: Change rate schedules or other changes in utility service | $2,872 | $3,935 |
$2,872
-
kWh
|
- | - | |
09 | 3.4151: Minimize water usage | $4,910 | $9,364 |
$4,910
46,307
kWh
|
- | - | |
TOTAL RECOMMENDED | $18,190 | $14,118 |
$17,578
242,086
kWh
|
$553
-
MMBtu
|
$59 | ||
TOTAL IMPLEMENTED | $5,286 | $9,364 |
$5,179
51,582
kWh
|
- | $107 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs