ITAC Assessment: OR0011
ITAC logo
ITAC Assessment: OR0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product FRUIT CONCENTRATE
NAICS
n/a
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area
n/a
Annual Production 59,400,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,013 3,575,029
kWh
Natural Gas $288,161 65,940
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,177 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,631

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $922 - $922
17,292
kWh
- -
02 2.2511: Insulate bare equipment $389 $96 - $389
-
MMBtu
-
03 2.2621: Modify refrigeration system to operate at a lower pressure $1,474 - $1,474
27,257
kWh
- -
04 2.2136: Install / repair insulation on steam lines $3,519 $1,536 - $3,519
-
MMBtu
-
05 2.2621: Modify refrigeration system to operate at a lower pressure $4,969 $3,600 $4,969
92,028
kWh
- -
06 2.2422: Use waste heat from hot flue gases to generate steam $4,103 $3,000 - $4,103
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,024 $1,092 $1,142
21,102
kWh
- $(-118.0)
08 2.4133: Use most efficient type of electric motors $777 $746 $777
14,361
kWh
- -
TOTAL RECOMMENDED $17,177 $10,070 $9,284
172,040
kWh
$8,011
-
MMBtu
$(-118.0)
TOTAL IMPLEMENTED $6,631 $3,470 $2,841
52,755
kWh
$3,908
-
MMBtu
$(-118.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs