Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product sewer cleaning equipment
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 24,000
ft2
Annual Production 15,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,342 126,792
kWh
Electricity Demand $2,167 800
kW-mo/yr
Electricity Fees $2,030 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $159,673 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,934

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
01 2.8112: Combine utility meters $3,197 $7,500 - - - - $3,197 -
02 2.7144: Install spectral reflectors / delamp $1,249 $2,745 $1,062
10,616
kWh
$187
-
kW-mo/yr
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $934 $130 $1,100
11,001
kWh
$194
-
kW-mo/yr
- $(-360.0) - -
04 3.3121: Use screening, magnetic separation to remove contaminants $2,293 $40 - - $2,293
-
gal
- - -
05 4.521: Clear and rent existing space $121,000 $12,000 - - - - $121,000 -
06 4.611: Begin a practice of predictive / preventative maintenance $18,500 $600 - - - $(-2,400.0) - $20,900
07 4.321: Optimize production lot sizes and inventories $12,500 - - - - - $12,500 -
TOTAL RECOMMENDED $159,673 $23,015 $2,162
21,617
kWh
$381
-
kW-mo/yr
$2,293
-
gal
$(-2,760.0) $136,697 $20,900
TOTAL IMPLEMENTED $31,934 $730 $1,100
11,001
kWh
$194
-
kW-mo/yr
- $(-2,760.0) $12,500 $20,900
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs