ITAC Assessment: OR0002
ITAC logo
ITAC Assessment: OR0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product LEAD ACID BATTERIES
NAICS
n/a
SIC 3691: Storage Batteries
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area
n/a
Annual Production 297,360
pieces
Production Hrs. Annual 5,808
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,237 4,216,002
kWh
Natural Gas $45,626 9,728
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,908 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,695

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $2,190 $300 - $2,190
-
MMBtu
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,568 $550 $4,568
-
kWh
- -
03 3.4151: Minimize water usage $1,082 $300 - $761
-
MMBtu
$321
04 2.2414: Use waste heat from hot flue gases to preheat $3,563 $4,730 - $3,563
-
MMBtu
-
05 2.3212: Optimize plant power factor $4,962 $7,398 $4,962
-
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $543 $970 $608
19,637
kWh
- $(-65.0)
TOTAL RECOMMENDED $16,908 $14,248 $10,138
19,637
kWh
$6,514
-
MMBtu
$256
TOTAL IMPLEMENTED $7,695 $8,668 $5,570
19,637
kWh
$2,190
-
MMBtu
$(-65.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs