Assessment Year | 1987 |
---|---|
Principal Product | LEAD ACID BATTERIES |
NAICS |
n/a
|
SIC | 3691: Storage Batteries |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
n/a
|
Annual Production | 297,360
pieces
|
Production Hrs. Annual | 5,808
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $131,237 | 4,216,002 |
kWh
|
$0.031 |
Natural Gas | $45,626 | 9,728 |
MMBtu
|
$4.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,908 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,695 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,190 | $300 | - |
$2,190
-
MMBtu
|
- | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,568 | $550 |
$4,568
-
kWh
|
- | - | |
03 | 3.4151: Minimize water usage | $1,082 | $300 | - |
$761
-
MMBtu
|
$321 | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $3,563 | $4,730 | - |
$3,563
-
MMBtu
|
- | |
05 | 2.3212: Optimize plant power factor | $4,962 | $7,398 |
$4,962
-
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $543 | $970 |
$608
19,637
kWh
|
- | $(-65.0) | |
TOTAL RECOMMENDED | $16,908 | $14,248 |
$10,138
19,637
kWh
|
$6,514
-
MMBtu
|
$256 | ||
TOTAL IMPLEMENTED | $7,695 | $8,668 |
$5,570
19,637
kWh
|
$2,190
-
MMBtu
|
$(-65.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs