| Assessment Year | 2025 |
|---|---|
| Principal Product | Frames for switchboards & switch gear |
| NAICS | 334118: Computer Terminal and Other Computer Peripheral Equipment Manufacturing |
| SIC | 3577: Computer Peripheral Equipment, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 151 |
| Plant Area |
40,500
ft2
|
| Annual Production | 7,000
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $62,278 | 1,310,225 |
kWh
|
$0.048 | |
| Electricity Demand | $39,036 | 3,786 |
kW-mo/yr
|
$10.31 | |
| Natural Gas | $4,995 | 1,053 |
MMBtu
|
$4.74 | |
| Waste Disposal Costs | |||||
| Water Usage | $6,025 | 1,298 |
Tgal
|
$4.64 | |
| Water Disposal | $7,202 | 748 |
Tgal
|
$9.63 | |
| TOTAL YEARLY COSTS | $119,536 | ||||
| RECOMMENDED SAVINGS* | $66,657 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7135: Install occupancy sensors | $245 | $900 |
$245
5,110
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,351 | $3,460 |
$5,351
111,480
kWh
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,661 | $3,410 |
$3,661
76,270
kWh
|
- | |
| 04 | 2.5194: Redesign process | $57,400 | $29,297 | - | $57,400 | |
| TOTAL RECOMMENDED | $66,657 | $37,067 |
$9,257
192,860
kWh
|
$57,400 | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs