ITAC Assessment: OK1161
ITAC logo
ITAC Assessment: OK1161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Frames for switchboards & switch gear
NAICS 334118: Computer Terminal and Other Computer Peripheral Equipment Manufacturing
SIC 3577: Computer Peripheral Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 151
Plant Area 40,500
ft2
Annual Production 7,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,278 1,310,225
kWh
Electricity Demand $39,036 3,786
kW-mo/yr
Natural Gas $4,995 1,053
MMBtu
Waste Disposal Costs
Water Usage $6,025 1,298
Tgal
Water Disposal $7,202 748
Tgal
TOTAL YEARLY COSTS $119,536
RECOMMENDED SAVINGS* $70,488 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $245 $900 $245
5,110
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,351 $3,460 $5,351
111,480
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,661 $3,410 $3,661
76,270
kWh
- -
04 2.7492: Use proper thickness of insulation on building envelope $3,533 $109,260 $1,486
30,954
kWh
$2,047
-
MMBtu
-
05 2.5194: Redesign process $57,698 $29,595 - - $57,698
TOTAL RECOMMENDED $70,488 $146,625 $10,743
223,814
kWh
$2,047
-
MMBtu
$57,698
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs