Assessment Year | 2025 |
---|---|
Principal Product | Frames for switchboards & switch gear |
NAICS | 334118: Computer Terminal and Other Computer Peripheral Equipment Manufacturing |
SIC | 3577: Computer Peripheral Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 151 |
Plant Area |
40,500
ft2
|
Annual Production | 7,000
units
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $62,278 | 1,310,225 |
kWh
|
$0.048 | |
Electricity Demand | $39,036 | 3,786 |
kW-mo/yr
|
$10.31 | |
Natural Gas | $4,995 | 1,053 |
MMBtu
|
$4.74 | |
Waste Disposal Costs | |||||
Water Usage | $6,025 | 1,298 |
Tgal
|
$4.64 | |
Water Disposal | $7,202 | 748 |
Tgal
|
$9.63 | |
TOTAL YEARLY COSTS | $119,536 | ||||
RECOMMENDED SAVINGS* | $70,488 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $245 | $900 |
$245
5,110
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,351 | $3,460 |
$5,351
111,480
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,661 | $3,410 |
$3,661
76,270
kWh
|
- | - | |
04 | 2.7492: Use proper thickness of insulation on building envelope | $3,533 | $109,260 |
$1,486
30,954
kWh
|
$2,047
-
MMBtu
|
- | |
05 | 2.5194: Redesign process | $57,698 | $29,595 | - | - | $57,698 | |
TOTAL RECOMMENDED | $70,488 | $146,625 |
$10,743
223,814
kWh
|
$2,047
-
MMBtu
|
$57,698 | ||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs