ITAC Assessment: OK1115
ITAC logo
ITAC Assessment: OK1115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product HVAC parts and remanufacturing of HVAC compressors
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 96,000
ft2
Annual Production 9,400
units
Production Hrs. Annual 2,295
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,614 1,363,200
kWh
Electricity Demand $32,205 4,425
kW-mo/yr
Natural Gas $7,133 1,221
MMBtu
Waste Disposal Costs
Water Usage $2,913 630
Tgal
Water Disposal $3,154 630
Tgal
TOTAL YEARLY COSTS $145,019
RECOMMENDED SAVINGS* $34,044 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $947 $6,554 $947
12,967
kWh
-
02 2.9114: Use solar heat to make electricty $17,916 $166,007 $17,916
245,418
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,084 $2,944 $2,084
28,553
kWh
-
04 2.7211: Clean and maintain refrigerant condensers and towers $7,273 $11,595 $7,273
99,635
kWh
-
05 2.7212: Install or upgrade insulation on hvac distribution systems $4,659 $47,850 $4,659
63,826
kWh
-
06 2.3212: Optimize plant power factor $1,165 $3,332 - $1,165
TOTAL RECOMMENDED $34,044 $238,282 $32,879
450,399
kWh
$1,165
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs