| Assessment Year | 2024 |
|---|---|
| Principal Product | HVAC parts and remanufacturing of HVAC compressors |
| NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 135 |
| Plant Area |
96,000
ft2
|
| Annual Production | 9,400
units
|
| Production Hrs. Annual | 2,295
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $99,614 | 1,363,200 |
kWh
|
$0.073 | |
| Electricity Demand | $32,205 | 4,425 |
kW-mo/yr
|
$7.28 | |
| Natural Gas | $7,133 | 1,221 |
MMBtu
|
$5.84 | |
| Waste Disposal Costs | |||||
| Water Usage | $2,913 | 630 |
Tgal
|
$4.62 | |
| Water Disposal | $3,154 | 630 |
Tgal
|
$5.01 | |
| TOTAL YEARLY COSTS | $145,019 | ||||
| RECOMMENDED SAVINGS* | $34,044 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7135: Install occupancy sensors | $947 | $6,554 |
$947
12,967
kWh
|
- | |
| 02 | 2.9114: Use solar heat to make electricty | $17,916 | $166,007 |
$17,916
245,418
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,084 | $2,944 |
$2,084
28,553
kWh
|
- | |
| 04 | 2.7211: Clean and maintain refrigerant condensers and towers | $7,273 | $11,595 |
$7,273
99,635
kWh
|
- | |
| 05 | 2.7212: Install or upgrade insulation on hvac distribution systems | $4,659 | $47,850 |
$4,659
63,826
kWh
|
- | |
| 06 | 2.3212: Optimize plant power factor | $1,165 | $3,332 | - | $1,165 | |
| TOTAL RECOMMENDED | $34,044 | $238,282 |
$32,879
450,399
kWh
|
$1,165 | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs