ITAC Assessment: OK1109
ITAC logo
ITAC Assessment: OK1109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Rebuilt jet engines
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 160
Plant Area 271,962
ft2
Annual Production 100
units
Production Hrs. Annual 5,824
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,807 2,485,837
kWh
Electricity Demand $72,936 9,368
kW-mo/yr
Natural Gas $35,113 7,013
MMBtu
Waste Disposal Costs
Water Usage $2,233 822
Tgal
Water Disposal $5,713 822
Tgal
TOTAL YEARLY COSTS $334,802
RECOMMENDED SAVINGS* $117,633 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,474

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,576 $44,000 $10,021
113,869
kWh
$2,555
-
kW-mo/yr
-
02 2.9114: Use solar heat to make electricty $58,213 $394,200 $58,213
661,510
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,162 $3,598 $8,162
92,750
kWh
- -
04 2.6211: Conserve energy by efficient use of vending machines $213 $820 $213
2,418
kWh
- -
05 2.7211: Clean and maintain refrigerant condensers and towers $5,582 $11,028 $5,582
63,434
kWh
- -
06 2.7232: Replace existing hvac unit with high efficiency model $5,867 $38,775 $5,867
66,674
kWh
- -
07 2.3191: Use demand controller or load shedder $8,413 $3,850 - $8,413
-
kW-mo/yr
-
08 2.7226: Use computer programs to optimize hvac performance $18,482 $120,578 $13,562
154,115
kWh
- $4,920
-
MMBtu
09 2.2622: Replace existing chiller with high efficiency model $125 $825 $125
1,419
kWh
- -
TOTAL RECOMMENDED $117,633 $617,674 $101,745
1,156,189
kWh
$10,968
-
kW-mo/yr
$4,920
-
MMBtu
TOTAL IMPLEMENTED $24,474 $160,178 $19,554
222,208
kWh
- $4,920
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs