ITAC Assessment: OK1101
ITAC logo
ITAC Assessment: OK1101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product not applicable
NAICS 713210: Casinos (except Casino Hotels)
SIC 7999: Amusement and Recreation Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 18,683
ft2
Annual Production 1
units
Production Hrs. Annual 5,304
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,338 1,414,229
kWh
Natural Gas $3,353 355
MMBtu
Waste Disposal Costs
Water Usage $1,738 607
Tgal
Water Disposal $2,192 238
Tgal
TOTAL YEARLY COSTS $147,621
RECOMMENDED SAVINGS* $21,849 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,452

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,452 $2,800 $9,452
95,471
kWh
-
02 2.7492: Use proper thickness of insulation on building envelope $5,367 $34,835 $1,714
17,309
kWh
$3,653
-
MMBtu
03 2.7211: Clean and maintain refrigerant condensers and towers $2,746 $1,530 $2,746
27,740
kWh
-
04 2.7232: Replace existing hvac unit with high efficiency model $4,284 $18,000 $4,284
43,272
kWh
-
TOTAL RECOMMENDED $21,849 $57,165 $18,196
183,792
kWh
$3,653
-
MMBtu
TOTAL IMPLEMENTED $9,452 $2,800 $9,452
95,471
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs