Assessment Year | 2023 |
---|---|
Principal Product | Plastic molded tools and containment fixtures |
NAICS | 326121: Unlaminated Plastics Profile Shape Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
220,000
ft2
|
Annual Production | 9,000,000
units
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $606,861 | 9,994,900 |
kWh
|
$0.061 | |
Electricity Demand | $232,864 | 19,323 |
kW-mo/yr
|
$12.05 | |
Natural Gas | $17,967 | 2,622 |
MMBtu
|
$6.85 | |
Waste Disposal Costs | |||||
Water Usage | $2,899 | 308 |
Tgal
|
$9.41 | |
Water Disposal | $2,412 | 308 |
Tgal
|
$7.83 | |
TOTAL YEARLY COSTS | $863,003 | ||||
RECOMMENDED SAVINGS* | $101,972 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $29,723 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $72,249 | $820,666 |
$70,646
1,163,847
kWh
|
$1,603
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,853 | - |
$2,853
46,998
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,322 | $2,730 |
$10,322
172,032
kWh
|
- | - | |
04 | 2.7211: Clean and maintain refrigerant condensers and towers | $15,984 | $2,567 |
$15,984
263,328
kWh
|
- | - | |
05 | 2.8118: Check for accuracy of utility / power meters | $564 | - | - | - | $564 | |
TOTAL RECOMMENDED | $101,972 | $825,963 |
$99,805
1,646,205
kWh
|
$1,603
-
kW-mo/yr
|
$564 | ||
TOTAL IMPLEMENTED | $29,723 | $5,297 |
$29,159
482,358
kWh
|
- | $564 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs