ITAC Assessment: OK1084
ITAC logo
ITAC Assessment: OK1084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Construction tools
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 181,300
ft2
Annual Production 65,000
units
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $457,408 5,717,600
kWh
Natural Gas $43,094 5,407
MMBtu
Waste Disposal Costs
Water Usage $22,466 6,105
Tgal
Water Disposal $37,517 4,866
Tgal
TOTAL YEARLY COSTS $560,485
RECOMMENDED SAVINGS* $32,060 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7232: Replace existing hvac unit with high efficiency model $1,015 $4,620 $1,015
12,683
kWh
-
02 2.9114: Use solar heat to make electricty $28,652 $258,706 $28,652
358,156
kWh
-
03 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $2,393 $6,035 - $2,393
-
MMBtu
TOTAL RECOMMENDED $32,060 $269,361 $29,667
370,839
kWh
$2,393
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs