ITAC Assessment: OK1074
ITAC logo
ITAC Assessment: OK1074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Lubricating oils
NAICS 324191: Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992: Lubricating Oils and Greases
Sales Range $10
M
to 50
M
# of Employees 14
Plant Area 40,000
ft2
Annual Production 410
Tgal
Production Hrs. Annual 2,730
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,875 603,400
kWh
Natural Gas $31,218 1,432
MMBtu
Waste Disposal Costs
Water Usage $164 35
Tgal
Water Disposal $366 32
Tgal
TOTAL YEARLY COSTS $87,623
RECOMMENDED SAVINGS* $4,745 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,213

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $362 - $362
3,910
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $470 $187 $470
5,079
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,000 $2,520 $1,000
10,800
kWh
-
04 2.7211: Clean and maintain refrigerant condensers and towers $1,213 $895 $1,213
13,104
kWh
-
05 2.2511: Insulate bare equipment $1,700 $611 - $1,700
-
MMBtu
TOTAL RECOMMENDED $4,745 $4,213 $3,045
32,893
kWh
$1,700
-
MMBtu
TOTAL IMPLEMENTED $2,213 $3,415 $2,213
23,904
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs