ITAC Assessment: OK1067
ITAC logo
ITAC Assessment: OK1067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Recreational boats
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $50
M
to 100
M
# of Employees 321
Plant Area 227,684
ft2
Annual Production 2,880
units
Production Hrs. Annual 2,475
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $351,148 4,389,350
kWh
Electricity Demand $90,143 15,150
kW-mo/yr
Natural Gas $147,453 27,006
MMBtu
Waste Disposal Costs
Water Usage $8,914 985
Tgal
Water Disposal $6,276 813
Tgal
TOTAL YEARLY COSTS $603,934
RECOMMENDED SAVINGS* $49,624 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,143

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $25,333 $81,525 $18,621
232,764
kWh
$6,712
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,849 $11,877 $4,849
60,614
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,225 $2,550 $4,225
52,818
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,861 - $1,861
23,264
kWh
- -
05 2.2449: Recover heat from exhausted steam, hot air or hot water $1,256 $3,146 - - $1,256
-
MMBtu
06 2.7224: Reduce space conditioning during non-working hours $12,100 - $4,568
57,096
kWh
- $7,532
-
MMBtu
TOTAL RECOMMENDED $49,624 $99,098 $34,124
426,556
kWh
$6,712
-
kW-mo/yr
$8,788
-
MMBtu
TOTAL IMPLEMENTED $44,143 $93,402 $29,899
373,738
kWh
$6,712
-
kW-mo/yr
$7,532
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs