ITAC Assessment: OK1066
ITAC logo
ITAC Assessment: OK1066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Measurement products for oil & gas sector
NAICS 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $50
M
to 100
M
# of Employees 280
Plant Area 195,000
ft2
Annual Production 11,653
units
Production Hrs. Annual 2,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $274,050 3,654,000
kWh
Natural Gas $28,285 4,835
MMBtu
Waste Disposal Costs
Water Usage $2,966 631
Tgal
TOTAL YEARLY COSTS $305,301
RECOMMENDED SAVINGS* $33,162 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,732

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $3,854 $7,908 - $3,854 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,182 - $2,182
29,094
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,177 $23,400 $5,177
69,030
kWh
- -
04 2.6211: Conserve energy by efficient use of vending machines $399 $510 $399
5,322
kWh
- -
05 2.7224: Reduce space conditioning during non-working hours $7,555 - $5,110
68,144
kWh
- $2,445
-
MMBtu
06 2.9114: Use solar heat to make electricty $13,995 $191,438 $13,995
186,600
kWh
- -
TOTAL RECOMMENDED $33,162 $223,256 $26,863
358,190
kWh
$3,854 $2,445
-
MMBtu
TOTAL IMPLEMENTED $12,732 $23,400 $10,287
137,174
kWh
- $2,445
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs