ITAC Assessment: OK1065
ITAC logo
ITAC Assessment: OK1065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product plastic and metallic pipe fittings
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $100
M
to 500
M
# of Employees 620
Plant Area 312,500
ft2
Annual Production 7,500,000
units
Production Hrs. Annual 8,688
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $655,074 15,234,280
kWh
Electricity Demand $190,452 31,742
kW-mo/yr
Electricity Fees $1,896 -
Natural Gas $107,896 34,805
MMBtu
Waste Disposal Costs
Water Usage $20,885 4,641
Tgal
TOTAL YEARLY COSTS $976,203
RECOMMENDED SAVINGS* $54,042 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,042

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7232: Replace existing hvac unit with high efficiency model $2,073 $12,233 $1,305
30,350
kWh
$768
-
kW-mo/yr
02 2.4239: Eliminate or reduce compressed air usage $29,263 - $29,263
680,531
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,433 $2,429 $8,433
196,106
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $14,273 $21,539 $11,969
278,337
kWh
$2,304
-
kW-mo/yr
TOTAL RECOMMENDED $54,042 $36,201 $50,970
1,185,324
kWh
$3,072
-
kW-mo/yr
TOTAL IMPLEMENTED $54,042 $36,201 $50,970
1,185,324
kWh
$3,072
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs