ITAC Assessment: OK1057
ITAC logo
ITAC Assessment: OK1057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Extruded Plastic Conduit
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $50
M
to 100
M
# of Employees 93
Plant Area 82,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $782,535 15,650,700
kWh
Electricity Demand $234,070 25,722
kW-mo/yr
Electricity Fees $1,828 -
Natural Gas $5,387 913
MMBtu
Waste Disposal Costs
Water Usage $2,101 361
Tgal
TOTAL YEARLY COSTS $1,025,921
RECOMMENDED SAVINGS* $25,577 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,044

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7211: Clean and maintain refrigerant condensers and towers $10,601 $1,701 $10,601
212,016
kWh
02 2.2614: Use cooling tower or economizer to replace chiller cooling $12,483 $56,000 $12,483
249,660
kWh
03 2.7232: Replace existing hvac unit with high efficiency model $533 $1,400 $533
10,659
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,960 - $1,960
39,209
kWh
TOTAL RECOMMENDED $25,577 $59,101 $25,577
511,544
kWh
TOTAL IMPLEMENTED $25,044 $57,701 $25,044
500,885
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs