| Assessment Year | 2021 |
|---|---|
| Principal Product | Extruded Plastic Conduit |
| NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
| SIC | 3084: Plastics Pipe |
| Sales Range | $50 M to 100M |
| # of Employees | 93 |
| Plant Area |
82,000
ft2
|
| Annual Production | 50,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $782,535 | 15,650,700 |
kWh
|
$0.050 | |
| Electricity Demand | $234,070 | 25,722 |
kW-mo/yr
|
$9.10 | |
| Electricity Fees | $1,828 | - |
|
- | |
| Natural Gas | $5,387 | 913 |
MMBtu
|
$5.90 | |
| Waste Disposal Costs | |||||
| Water Usage | $2,101 | 361 |
Tgal
|
$5.82 | |
| TOTAL YEARLY COSTS | $1,025,921 | ||||
| RECOMMENDED SAVINGS* | $25,577 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $25,044 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7211: Clean and maintain refrigerant condensers and towers | $10,601 | $1,701 |
$10,601
212,016
kWh
|
|
| 02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $12,483 | $56,000 |
$12,483
249,660
kWh
|
|
| 03 | 2.7232: Replace existing hvac unit with high efficiency model | $533 | $1,400 |
$533
10,659
kWh
|
|
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,960 | - |
$1,960
39,209
kWh
|
|
| TOTAL RECOMMENDED | $25,577 | $59,101 |
$25,577
511,544
kWh
|
||
| TOTAL IMPLEMENTED | $25,044 | $57,701 |
$25,044
500,885
kWh
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs