ITAC Assessment: OK1055
ITAC logo
ITAC Assessment: OK1055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Plastic pipe
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $100
M
to 500
M
# of Employees 105
Plant Area 144,228
ft2
Annual Production 126,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $828,729 13,812,153
kWh
Electricity Demand $156,200 33,376
kW-mo/yr
Electricity Fees $1,584 -
Natural Gas $10,342 1,390
MMBtu
Waste Disposal Costs
Water Usage $7,660 1,337
Tgal
Water Disposal $12,443 1,337
Tgal
TOTAL YEARLY COSTS $1,016,958
RECOMMENDED SAVINGS* $472,766 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 3.2176: Increase use of automation $444,132 $165,066 - - $444,132
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,307 $26,424 $9,572
159,529
kWh
$735
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,454 $1,872 $7,640
127,331
kWh
$814
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $7,169 - $7,169
119,486
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,704 $1,561 $2,704
45,070
kWh
- -
TOTAL RECOMMENDED $472,766 $194,923 $27,085
451,416
kWh
$1,549
-
kW-mo/yr
$444,132
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs