Assessment Year | 2021 |
---|---|
Principal Product | Plastic pipe |
NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
SIC | 3084: Plastics Pipe |
Sales Range | $100 M to 500M |
# of Employees | 105 |
Plant Area |
144,228
ft2
|
Annual Production | 126,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $828,729 | 13,812,153 |
kWh
|
$0.060 | |
Electricity Demand | $156,200 | 33,376 |
kW-mo/yr
|
$4.68 | |
Electricity Fees | $1,584 | - |
|
- | |
Natural Gas | $10,342 | 1,390 |
MMBtu
|
$7.44 | |
Waste Disposal Costs | |||||
Water Usage | $7,660 | 1,337 |
Tgal
|
$5.73 | |
Water Disposal | $12,443 | 1,337 |
Tgal
|
$9.31 | |
TOTAL YEARLY COSTS | $1,016,958 | ||||
RECOMMENDED SAVINGS* | $472,766 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 3.2176: Increase use of automation | $444,132 | $165,066 | - | - | $444,132 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,307 | $26,424 |
$9,572
159,529
kWh
|
$735
-
kW-mo/yr
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,454 | $1,872 |
$7,640
127,331
kWh
|
$814
-
kW-mo/yr
|
- | |
04 | 2.4239: Eliminate or reduce compressed air usage | $7,169 | - |
$7,169
119,486
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,704 | $1,561 |
$2,704
45,070
kWh
|
- | - | |
TOTAL RECOMMENDED | $472,766 | $194,923 |
$27,085
451,416
kWh
|
$1,549
-
kW-mo/yr
|
$444,132 | ||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs