ITAC Assessment: OK1054
ITAC logo
ITAC Assessment: OK1054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Manufactured & Repaired Airfoils
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 26
Plant Area 48,675
ft2
Annual Production 18,667
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,318 2,851,500
kWh
Electricity Demand $71,619 13,826
kW-mo/yr
Electricity Fees $31,010 -
Natural Gas $17,961 3,151
MMBtu
Waste Disposal Costs
Water Usage $5,923 1,041
Tgal
TOTAL YEARLY COSTS $254,831
RECOMMENDED SAVINGS* $10,632 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,971

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $7,661 $7,500 - $7,661
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,347 $2,505 $2,347
52,161
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $624 $2,620 $624
13,858
kWh
-
TOTAL RECOMMENDED $10,632 $12,625 $2,971
66,019
kWh
$7,661
TOTAL IMPLEMENTED $2,971 $5,125 $2,971
66,019
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs