ITAC Assessment: OK1052
ITAC logo
ITAC Assessment: OK1052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product heat exchangers
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 150,000
ft2
Annual Production 10,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,649 2,135,900
kWh
Electricity Fees $3,512 -
Natural Gas $8,025 7,295
MMBtu
Waste Disposal Costs
Water Usage $21,924 3,654
Tgal
TOTAL YEARLY COSTS $185,110
RECOMMENDED SAVINGS* $16,202 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,648

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $1,512 $6,000 - $1,512 -
02 2.7231: Use radiant heater for spot heating $4,517 $19,500 - - $4,517
-
MMBtu
03 2.4239: Eliminate or reduce compressed air usage $1,322 - $1,322
18,620
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,648 $13,284 $6,648
93,638
kWh
- -
05 2.7135: Install occupancy sensors $2,203 $586 $2,203
31,033
kWh
- -
TOTAL RECOMMENDED $16,202 $39,370 $10,173
143,291
kWh
$1,512 $4,517
-
MMBtu
TOTAL IMPLEMENTED $6,648 $13,284 $6,648
93,638
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs