ITAC Assessment: OK1044
ITAC logo
ITAC Assessment: OK1044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Bottled and Canned Soft Drinks
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 324
Plant Area 495,245
ft2
Annual Production 51,291
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $569,810 14,245,259
kWh
Electricity Demand $288,728 27,290
kW-mo/yr
Electricity Fees $3,871 -
Natural Gas $427,175 168,844
MMBtu
Waste Disposal Costs
Water Usage $526,715 212,385
Tgal
Water Disposal $354,557 148,990
Tgal
TOTAL YEARLY COSTS $2,170,856
RECOMMENDED SAVINGS* $29,584 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,702

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4239: Eliminate or reduce compressed air usage $3,137 - $3,137
78,420
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,516 $3,266 $8,516
212,887
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $14,702 $14,800 $10,792
269,808
kWh
$3,910
-
kW-mo/yr
-
04 2.3212: Optimize plant power factor $3,229 $11,200 - - $3,229
TOTAL RECOMMENDED $29,584 $29,266 $22,445
561,115
kWh
$3,910
-
kW-mo/yr
$3,229
TOTAL IMPLEMENTED $14,702 $14,800 $10,792
269,808
kWh
$3,910
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs