ITAC Assessment: MAS016
ITAC logo
ITAC Assessment: MAS016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product nozzles
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 60,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 6,732
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,614 1,691,280
kWh
Electricity Demand $65,578 5,319
kW-mo/yr
Electricity Fees $8,400 -
LPG $115,014 5,524
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,499 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,420

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,510 $5,600 $17,638
176,380
kWh
$3,872
-
kW-mo/yr
- -
02 3.4115: Recover and reuse cooling water $79 $375 - - $79
-
Tgal
-
03 2.8118: Check for accuracy of utility / power meters $9,910 - - - - $9,910
TOTAL RECOMMENDED $31,499 $5,975 $17,638
176,380
kWh
$3,872
-
kW-mo/yr
$79
-
Tgal
$9,910
TOTAL IMPLEMENTED $31,420 $5,600 $17,638
176,380
kWh
$3,872
-
kW-mo/yr
- $9,910
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs