Assessment Year | 2021 |
---|---|
Principal Product | Aircraft engine parts |
NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $100 M to 500M |
# of Employees | 150 |
Plant Area |
130,000
ft2
|
Annual Production | 2,400
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $517,893 | 7,104,000 |
kWh
|
$0.073 | |
Electricity Demand | $152,523 | 16,651 |
kW-mo/yr
|
$9.16 | |
Natural Gas | $4,606 | 601 |
MMBtu
|
$7.66 | |
Waste Disposal Costs | |||||
Water Usage | $17,583 | 1,762 |
Tgal
|
$9.98 | |
TOTAL YEARLY COSTS | $692,605 | ||||
RECOMMENDED SAVINGS* | $16,136 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $14,128 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $2,091 | $8,000 |
$2,091
28,642
kWh
|
- | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $331 | $1,650 |
$331
4,530
kWh
|
- | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $8,309 | $35,400 |
$4,920
67,395
kWh
|
$3,389
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,397 | $2,946 |
$3,397
46,533
kWh
|
- | |
05 | 2.6211: Conserve energy by efficient use of vending machines | $2,008 | $952 |
$2,008
27,506
kWh
|
- | |
TOTAL RECOMMENDED | $16,136 | $48,948 |
$12,747
174,606
kWh
|
$3,389
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $14,128 | $47,996 |
$10,739
147,100
kWh
|
$3,389
-
kW-mo/yr
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs