ITAC Assessment: OK1043
ITAC logo
ITAC Assessment: OK1043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Aircraft engine parts
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 130,000
ft2
Annual Production 2,400
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $517,893 7,104,000
kWh
Electricity Demand $152,523 16,651
kW-mo/yr
Natural Gas $4,606 601
MMBtu
Waste Disposal Costs
Water Usage $17,583 1,762
Tgal
TOTAL YEARLY COSTS $692,605
RECOMMENDED SAVINGS* $16,136 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,128

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2622: Replace existing chiller with high efficiency model $2,091 $8,000 $2,091
28,642
kWh
-
02 2.7232: Replace existing hvac unit with high efficiency model $331 $1,650 $331
4,530
kWh
-
03 2.7232: Replace existing hvac unit with high efficiency model $8,309 $35,400 $4,920
67,395
kWh
$3,389
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,397 $2,946 $3,397
46,533
kWh
-
05 2.6211: Conserve energy by efficient use of vending machines $2,008 $952 $2,008
27,506
kWh
-
TOTAL RECOMMENDED $16,136 $48,948 $12,747
174,606
kWh
$3,389
-
kW-mo/yr
TOTAL IMPLEMENTED $14,128 $47,996 $10,739
147,100
kWh
$3,389
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs