ITAC Assessment: OK1039
ITAC logo
ITAC Assessment: OK1039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product educated students
NAICS 611210: Junior Colleges
SIC 8222: Junior Colleges and Technical Institutes
Sales Range $10
M
to 50
M
# of Employees 490
Plant Area 492,653
ft2
Annual Production 8,404
units
Production Hrs. Annual 3,216
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $321,563 7,478,200
kWh
Electricity Demand $102,521 19,056
kW-mo/yr
Electricity Fees $3,360 -
Natural Gas $58,785 23,514
MMBtu
Waste Disposal Costs
Water Usage $66,451 12,444
Tgal
TOTAL YEARLY COSTS $552,680
RECOMMENDED SAVINGS* $4,452 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,492

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6127: Maintain air filters by cleaning or replacement $361 $570 $361
8,397
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $710 $3,438 $484
11,256
kWh
$226
-
kW-mo/yr
-
03 2.7232: Replace existing hvac unit with high efficiency model $421 $488 $287
6,669
kWh
$134
-
kW-mo/yr
-
04 2.2425: Use flue gases to heat process or service water $2,960 $4,835 - - $2,960
-
MMBtu
TOTAL RECOMMENDED $4,452 $9,331 $1,132
26,322
kWh
$360
-
kW-mo/yr
$2,960
-
MMBtu
TOTAL IMPLEMENTED $1,492 $4,496 $1,132
26,322
kWh
$360
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs