ITAC Assessment: OK1032
ITAC logo
ITAC Assessment: OK1032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Machined components
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 143,000
ft2
Annual Production 7,000
units
Production Hrs. Annual 8,568
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,740 1,527,352
kWh
Electricity Demand $69,349 5,629
kW-mo/yr
Electricity Fees $1,200 -
Natural Gas $13,388 2,981
MMBtu
Waste Disposal Costs
Water Usage $2,262 611
Tgal
TOTAL YEARLY COSTS $124,939
RECOMMENDED SAVINGS* $15,582 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $417

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $10,720 $12,215 - - $10,720 -
02 2.7231: Use radiant heater for spot heating $4,244 $3,000 - - - $4,244
-
MMBtu
03 2.7232: Replace existing hvac unit with high efficiency model $417 $1,804 $146
5,610
kWh
$271
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $201 $1,049 $201
7,710
kWh
- - -
TOTAL RECOMMENDED $15,582 $18,068 $347
13,320
kWh
$271
-
kW-mo/yr
$10,720 $4,244
-
MMBtu
TOTAL IMPLEMENTED $417 $1,804 $146
5,610
kWh
$271
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs