ITAC Assessment: OK1030
ITAC logo
ITAC Assessment: OK1030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Treated wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 10
Plant Area 897,697
ft2
Annual Production 1,825,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $327,036 4,955,085
kWh
Electricity Demand $79,320 11,380
kW-mo/yr
Natural Gas $20,794 5,941
MMBtu
Waste Disposal Costs
Water Usage $120,702 15,696
Tgal
TOTAL YEARLY COSTS $547,852
RECOMMENDED SAVINGS* $96,448 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,533 $4,129 $12,533
189,895
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,018 $7,359 $3,018
45,731
kWh
-
03 2.7135: Install occupancy sensors $629 $387 $629
9,531
kWh
-
04 3.4111: Use closed cycle process to minimize waste water production $80,268 $2,200 - $80,268
-
Tgal
TOTAL RECOMMENDED $96,448 $14,075 $16,180
245,157
kWh
$80,268
-
Tgal
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs