Assessment Year | 2020 |
---|---|
Principal Product | Bio-solids |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $1 M to 5M |
# of Employees | 10 |
Plant Area |
538,426
ft2
|
Annual Production | 1,095,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $509,842 | 6,741,487 |
kWh
|
$0.076 | |
Natural Gas | $2,457 | 331 |
MMBtu
|
$7.42 | |
Waste Disposal Costs | |||||
Water Usage | $69,787 | 19,258 |
Tgal
|
$3.62 | |
TOTAL YEARLY COSTS | $582,086 | ||||
RECOMMENDED SAVINGS* | $146,235 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $18,521 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Usage Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|
01 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $70,403 | $206,750 | - | - | $70,403 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,303 | $6,900 |
$2,303
30,307
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,207 | $7,407 |
$6,207
81,665
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,521 | $4,542 |
$18,521
243,703
kWh
|
- | - | |
05 | 3.4111: Use closed cycle process to minimize waste water production | $48,801 | $12,552 | - |
$48,801
-
Tgal
|
- | |
TOTAL RECOMMENDED | $146,235 | $238,151 |
$27,031
355,675
kWh
|
$48,801
-
Tgal
|
$70,403 | ||
TOTAL IMPLEMENTED | $18,521 | $4,542 |
$18,521
243,703
kWh
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs