ITAC Assessment: OK1027
ITAC logo
ITAC Assessment: OK1027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Bio-solids
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area 538,426
ft2
Annual Production 1,095,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $509,842 6,741,487
kWh
Natural Gas $2,457 331
MMBtu
Waste Disposal Costs
Water Usage $69,787 19,258
Tgal
TOTAL YEARLY COSTS $582,086
RECOMMENDED SAVINGS* $146,235 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,521

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Usage Savings By-product Production Savings
01 3.6193: Install equipment (eg compactor) to reduce disposal costs $70,403 $206,750 - - $70,403
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,303 $6,900 $2,303
30,307
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,207 $7,407 $6,207
81,665
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,521 $4,542 $18,521
243,703
kWh
- -
05 3.4111: Use closed cycle process to minimize waste water production $48,801 $12,552 - $48,801
-
Tgal
-
TOTAL RECOMMENDED $146,235 $238,151 $27,031
355,675
kWh
$48,801
-
Tgal
$70,403
TOTAL IMPLEMENTED $18,521 $4,542 $18,521