ITAC Assessment: OK1018
ITAC logo
ITAC Assessment: OK1018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Hand trucks
NAICS 333922: Conveyor and Conveying Equipment Manufacturing
SIC 3535: Conveyors and Conveying Equipment
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 239,000
ft2
Annual Production 1,300,000
units
Production Hrs. Annual 3,432
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,786 2,273,399
kWh
Electricity Demand $213,706 10,978
kW-mo/yr
Electricity Fees $17,939 -
Natural Gas $72,950 16,533
MMBtu
TOTAL YEARLY COSTS $394,381
RECOMMENDED SAVINGS* $92,985 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $44,286 $21,990 - - $44,286
02 2.7142: Utilize higher efficiency lamps and/or ballasts $37,691 $60,951 $16,819
425,800
kWh
$20,872
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,409 $4,914 $2,409
60,988
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,577 - $1,577
39,914
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $2,422 $870 $889
22,514
kWh
$1,533
-
kW-mo/yr
-
06 2.7241: Install outside air damper / economizer on hvac unit $547 - $547
13,836
kWh
- -
07 2.7211: Clean and maintain refrigerant condensers and towers $507 $219 $155
3,924
kWh
$352
-
kW-mo/yr
-
08 2.7224: Reduce space conditioning during non-working hours $3,546 - $3,546
89,762
kWh
- -
TOTAL RECOMMENDED $92,985 $88,944 $25,942
656,738
kWh
$22,757
-
kW-mo/yr
$44,286
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs