| Assessment Year | 2019 |
|---|---|
| Principal Product | Hand trucks |
| NAICS | 333922: Conveyor and Conveying Equipment Manufacturing |
| SIC | 3535: Conveyors and Conveying Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 100 |
| Plant Area |
239,000
ft2
|
| Annual Production | 1,300,000
units
|
| Production Hrs. Annual | 3,432
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $89,786 | 2,273,399 |
kWh
|
$0.039 |
| Electricity Demand | $213,706 | 10,978 |
kW-mo/yr
|
$19.47 |
| Electricity Fees | $17,939 | - |
|
- |
| Natural Gas | $72,950 | 16,533 |
MMBtu
|
$4.41 |
| TOTAL YEARLY COSTS | $394,381 | |||
| RECOMMENDED SAVINGS* | $92,985 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $44,286 | $21,990 | - | - | $44,286 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $37,691 | $60,951 |
$16,819
425,800
kWh
|
$20,872
-
kW-mo/yr
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,409 | $4,914 |
$2,409
60,988
kWh
|
- | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,577 | - |
$1,577
39,914
kWh
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $2,422 | $870 |
$889
22,514
kWh
|
$1,533
-
kW-mo/yr
|
- | |
| 06 | 2.7241: Install outside air damper / economizer on hvac unit | $547 | - |
$547
13,836
kWh
|
- | - | |
| 07 | 2.7211: Clean and maintain refrigerant condensers and towers | $507 | $219 |
$155
3,924
kWh
|
$352
-
kW-mo/yr
|
- | |
| 08 | 2.7224: Reduce space conditioning during non-working hours | $3,546 | - |
$3,546
89,762
kWh
|
- | - | |
| TOTAL RECOMMENDED | $92,985 | $88,944 |
$25,942
656,738
kWh
|
$22,757
-
kW-mo/yr
|
$44,286 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs