ITAC Assessment: OK1010
ITAC logo
ITAC Assessment: OK1010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Pipeline Equipment
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 124,636
ft2
Annual Production 30,000
units
Production Hrs. Annual 3,120
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,167 2,547,900
kWh
Electricity Demand $112,548 8,654
kW-mo/yr
Natural Gas $67,794 15,963
MMBtu
Waste Disposal Costs
Water Usage $4,799 1,619
Tgal
Water Disposal $12,120 1,457
Tgal
TOTAL YEARLY COSTS $301,428
RECOMMENDED SAVINGS* $30,222 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,260

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $4,905 $12,400 - - $4,905 -
02 2.7261: Install timers and/or thermostats $7,438 $1,936 - - - $7,438
-
MMBtu
03 2.7211: Clean and maintain refrigerant condensers and towers $1,032 $947 $407
9,930
kWh
$625
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $885 $1,760 $885
21,592
kWh
- - -
05 2.2437: Recover waste heat from equipment $1,024 $3,948 - - - $1,024
-
MMBtu
06 2.2515: Use optimum thickness insulation $11,922 $53,750 $2,295
55,986
kWh
- - $9,627
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,016 $11,730 $3,016
73,554
kWh
- - -
TOTAL RECOMMENDED $30,222 $86,471 $6,603
161,062
kWh
$625
-
kW-mo/yr
$4,905 $18,089
-
MMBtu
TOTAL IMPLEMENTED $14,260 $17,043 $1,292
31,522
kWh
$625
-
kW-mo/yr
$4,905 $7,438
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings