Assessment Year | 2019 |
---|---|
Principal Product | Pipeline Equipment |
NAICS | 333120: Construction Machinery Manufacturing |
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 160 |
Plant Area |
124,636
ft2
|
Annual Production | 30,000
units
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $104,167 | 2,547,900 |
kWh
|
$0.041 | |
Electricity Demand | $112,548 | 8,654 |
kW-mo/yr
|
$13.01 | |
Natural Gas | $67,794 | 15,963 |
MMBtu
|
$4.25 | |
Waste Disposal Costs | |||||
Water Usage | $4,799 | 1,619 |
Tgal
|
$2.96 | |
Water Disposal | $12,120 | 1,457 |
Tgal
|
$8.32 | |
TOTAL YEARLY COSTS | $301,428 | ||||
RECOMMENDED SAVINGS* | $30,222 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $14,260 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $4,905 | $12,400 | - | - | $4,905 | - | |
02 | 2.7261: Install timers and/or thermostats | $7,438 | $1,936 | - | - | - |
$7,438
-
MMBtu
|
|
03 | 2.7211: Clean and maintain refrigerant condensers and towers | $1,032 | $947 |
$407
9,930
kWh
|
$625
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $885 | $1,760 |
$885
21,592
kWh
|
- | - | - | |
05 | 2.2437: Recover waste heat from equipment | $1,024 | $3,948 | - | - | - |
$1,024
-
MMBtu
|
|
06 | 2.2515: Use optimum thickness insulation | $11,922 | $53,750 |
$2,295
55,986
kWh
|
- | - |
$9,627
-
MMBtu
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,016 | $11,730 |
$3,016
73,554
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $30,222 | $86,471 |
$6,603
161,062
kWh
|
$625
-
kW-mo/yr
|
$4,905 |
$18,089
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,260 | $17,043 |
$1,292
31,522
kWh
|
$625
-
kW-mo/yr
|
$4,905 |
$7,438
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs