ITAC Assessment: OK1005
ITAC logo
ITAC Assessment: OK1005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product bio-solid
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 62
Plant Area 233,243
ft2
Annual Production 4,800
ton
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $840,480 21,012,000
kWh
Electricity Demand $641,779 34,560
kW-mo/yr
Electricity Fees $41,606 -
Natural Gas $107,961 27,471
MMBtu
TOTAL YEARLY COSTS $1,631,826
RECOMMENDED SAVINGS* $243,187 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $127,275 $96,138 $127,275
3,181,876
kWh
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,747 $27,232 $11,747
293,686
kWh
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,742 $13,761 $11,742
293,543
kWh
- - -
04 2.4322: Use or replace with energy efficient substitutes $7,674 $34,500 $7,674
191,844
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $59,363 $100,260 $40,548
1,013,695
kWh
$18,815
-
kW-mo/yr
- -
06 2.3212: Optimize plant power factor $20,771 $24,531 - - $20,771 -
07 2.7241: Install outside air damper / economizer on hvac unit $1,218 $5,291 $1,218
30,439
kWh
- - -
08 2.7211: Clean and maintain refrigerant condensers and towers $1,015 $548 $310
7,751
kWh
$705
-
kW-mo/yr
- -
09 2.7224: Reduce space conditioning during non-working hours $913 - $649
16,236
kWh
- - $264
-
MMBtu
10 2.1233: Analyze flue gas for proper air/fuel ratio $1,469 $300 - - - $1,469
-
MMBtu
TOTAL RECOMMENDED $243,187 $302,561 $201,163
5,029,070
kWh
$19,520
-
kW-mo/yr
$20,771 $1,733
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs