ITAC Assessment: OK1003
ITAC logo
ITAC Assessment: OK1003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product soft drinks
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 471,000
ft2
Annual Production 35,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $483,030 13,054,858
kWh
Electricity Demand $263,579 30,577
kW-mo/yr
Electricity Fees $10,123 -
Natural Gas $206,507 52,815
MMBtu
Waste Disposal Costs
Water Usage $410,492 119,677
Tgal
Water Disposal $258,297 22,539
Tgal
TOTAL YEARLY COSTS $1,632,028
RECOMMENDED SAVINGS* $92,422 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $77,493

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $2,820 $1,545 $2,820
76,224
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,094 $11,817 $2,094
56,604
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $13,476 $56,018 $10,218
276,159
kWh
$3,258
-
kW-mo/yr
- - -
04 2.2442: Preheat combustion air with waste heat $1,431 $7,700 - - - $1,431
-
MMBtu
-
05 3.4111: Use closed cycle process to minimize waste water production $10,817 $1,400 - - - - $10,817
-
Tgal
06 2.8123: Pay utility bills on time $9,631 - - - $9,631 - -
07 2.7241: Install outside air damper / economizer on hvac unit $48,286 $9,545 $48,286
1,305,029
kWh
- - - -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,867 $4,544 - - $3,867 - -
TOTAL RECOMMENDED $92,422 $92,569 $63,418
1,714,016
kWh
$3,258
-
kW-mo/yr
$13,498 $1,431
-
MMBtu
$10,817
-
Tgal
TOTAL IMPLEMENTED $77,493 $80,325 $63,418
1,714,016
kWh
$3,258
-
kW-mo/yr
- - $10,817
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs