Assessment Year | 2018 |
---|---|
Principal Product | Heat treatment for metal products |
NAICS | 332811: Metal Heat Treating |
SIC | 3398: Metal Heat Treating |
Sales Range | $1 M to 5M |
# of Employees | 19 |
Plant Area |
42,000
ft2
|
Annual Production | 2,500,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $106,736 | 2,456,001 |
kWh
|
$0.043 |
Electricity Demand | $160,151 | 8,253 |
kW-mo/yr
|
$19.41 |
Electricity Fees | $15,579 | - |
|
- |
Natural Gas | $51,688 | 7,491 |
MMBtu
|
$6.90 |
TOTAL YEARLY COSTS | $334,154 | |||
RECOMMENDED SAVINGS* | $47,050 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,450 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $36,593 | $39,111 | - | - | $36,593 | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,589 | $8,934 |
$3,454
80,312
kWh
|
$2,135
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,323 | $919 |
$1,323
30,763
kWh
|
- | - | - | |
04 | 2.2437: Recover waste heat from equipment | $866 | $936 | - | - | - |
$866
-
MMBtu
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $494 | - |
$494
11,499
kWh
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $362 | $597 |
$193
4,493
kWh
|
$169
-
kW-mo/yr
|
- | - | |
07 | 2.7224: Reduce space conditioning during non-working hours | $738 | - |
$165
3,836
kWh
|
- | - |
$573
-
MMBtu
|
|
08 | 2.7232: Replace existing hvac unit with high efficiency model | $600 | - |
$600
13,946
kWh
|
- | - | - | |
09 | 2.7211: Clean and maintain refrigerant condensers and towers | $485 | $292 |
$196
4,555
kWh
|
$289
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $47,050 | $50,789 |
$6,425
149,404
kWh
|
$2,593
-
kW-mo/yr
|
$36,593 |
$1,439
-
MMBtu
|
||
TOTAL IMPLEMENTED | $46,450 | $50,789 |
$5,825
135,458
kWh
|
$2,593
-
kW-mo/yr
|
$36,593 |
$1,439
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs