ITAC Assessment: OK0991
ITAC logo
ITAC Assessment: OK0991
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Semiconductors and related devices
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 42,000
ft2
Annual Production 3,600,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,167 6,367,558
kWh
Electricity Demand $213,808 10,304
kW-mo/yr
Natural Gas $7,814 823
MMBtu
TOTAL YEARLY COSTS $484,789
RECOMMENDED SAVINGS* $30,534 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,473

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,462 $17,053 $7,669
187,039
kWh
$4,793
-
kW-mo/yr
-
02 2.3212: Optimize plant power factor $7,248 $14,404 - - $7,248
03 2.7241: Install outside air damper / economizer on hvac unit $2,813 - $2,813
68,613
kWh
- -
04 2.7211: Clean and maintain refrigerant condensers and towers $5,577 $1,015 $2,298
56,057
kWh
$3,279
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,710 $536 $1,710
41,697
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $724 - $724
17,654
kWh
- -
TOTAL RECOMMENDED $30,534 $33,008 $15,214
371,060
kWh
$8,072
-
kW-mo/yr
$7,248
TOTAL IMPLEMENTED $20,473 $18,604 $12,401
302,447
kWh
$8,072
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs