Assessment Year | 2018 |
---|---|
Principal Product | Semiconductors and related devices |
NAICS | 334413: Semiconductor and Related Device Manufacturing |
SIC | 3674: Semiconductors and Related Devices |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
42,000
ft2
|
Annual Production | 3,600,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $263,167 | 6,367,558 |
kWh
|
$0.041 |
Electricity Demand | $213,808 | 10,304 |
kW-mo/yr
|
$20.75 |
Natural Gas | $7,814 | 823 |
MMBtu
|
$9.49 |
TOTAL YEARLY COSTS | $484,789 | |||
RECOMMENDED SAVINGS* | $30,534 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,473 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,462 | $17,053 |
$7,669
187,039
kWh
|
$4,793
-
kW-mo/yr
|
- | |
02 | 2.3212: Optimize plant power factor | $7,248 | $14,404 | - | - | $7,248 | |
03 | 2.7241: Install outside air damper / economizer on hvac unit | $2,813 | - |
$2,813
68,613
kWh
|
- | - | |
04 | 2.7211: Clean and maintain refrigerant condensers and towers | $5,577 | $1,015 |
$2,298
56,057
kWh
|
$3,279
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,710 | $536 |
$1,710
41,697
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $724 | - |
$724
17,654
kWh
|
- | - | |
TOTAL RECOMMENDED | $30,534 | $33,008 |
$15,214
371,060
kWh
|
$8,072
-
kW-mo/yr
|
$7,248 | ||
TOTAL IMPLEMENTED | $20,473 | $18,604 |
$12,401
302,447
kWh
|
$8,072
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs