ITAC Assessment: OK0982
ITAC logo
ITAC Assessment: OK0982
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product potable water and biosolid
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 2
Plant Area 450,000
ft2
Annual Production 91,848
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,496 454,480
kWh
TOTAL YEARLY COSTS $26,496
RECOMMENDED SAVINGS* $11,335 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,759

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,759 $8,500 $2,759
47,585
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $47 $1,278 $47
809
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $31 $243 $31
533
kWh
04 2.9114: Use solar heat to make electricty $8,498 $140,000 $8,498
146,523
kWh
TOTAL RECOMMENDED $11,335 $150,021 $11,335
195,450
kWh
TOTAL IMPLEMENTED $2,759 $8,500 $2,759
47,585
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs