| Assessment Year | 2018 |
|---|---|
| Principal Product | Munition |
| NAICS | 332993: Ammunition (except Small Arms) Manufacturing |
| SIC | 3483: Ammunition, Except for Small Arms |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
927,495
ft2
|
| Annual Production | 1,000,000
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $131,442 | 2,280,991 |
kWh
|
$0.058 | |
| Electricity Demand | $108,192 | 7,041 |
kW-mo/yr
|
$15.37 | |
| Fuel Oil #2 | $62,628 | 4,371 |
MMBtu
|
$14.33 | |
| Fuel Oil #6 | $97,621 | 11,260 |
MMBtu
|
$8.67 | |
| Waste Disposal Costs | |||||
| Water Usage | $59,815 | 6,804 |
Tgal
|
$8.79 | |
| TOTAL YEARLY COSTS | $459,698 | ||||
| RECOMMENDED SAVINGS* | $76,107 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $12,254 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #2 Savings | Fuel Oil #6 Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $12,254 | $1,350 |
$12,254
211,274
kWh
|
- | - | - | - | |
| 02 | 2.7134: Use photocell controls | $1,443 | $4,790 |
$650
11,211
kWh
|
$793
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,611 | $7,298 |
$707
12,191
kWh
|
$904
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $23,198 | $23,580 | - | - | - |
$9,439
-
MMBtu
|
$13,759
-
MMBtu
|
|
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $24,343 | $31,350 | - | - | - |
$9,905
-
MMBtu
|
$14,438
-
MMBtu
|
|
| 06 | 2.3212: Optimize plant power factor | $13,258 | $16,892 | - | - | $13,258 | - | - | |
| TOTAL RECOMMENDED | $76,107 | $85,260 |
$13,611
234,676
kWh
|
$1,697
-
kW-mo/yr
|
$13,258 |
$19,344
-
MMBtu
|
$28,197
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $12,254 | $1,350 |
$12,254
211,274
kWh
|
- | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #2 Savings | Fuel Oil #6 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs