ITAC Assessment: OK0980
ITAC logo
ITAC Assessment: OK0980
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Munition
NAICS 332993: Ammunition (except Small Arms) Manufacturing
SIC 3483: Ammunition, Except for Small Arms
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 927,495
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,442 2,280,991
kWh
Electricity Demand $108,192 7,041
kW-mo/yr
Fuel Oil #2 $62,628 4,371
MMBtu
Fuel Oil #6 $97,621 11,260
MMBtu
Waste Disposal Costs
Water Usage $59,815 6,804
Tgal
TOTAL YEARLY COSTS $459,698
RECOMMENDED SAVINGS* $76,107 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,254

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Fuel Oil #6 Savings
01 2.6218: Turn off equipment when not in use $12,254 $1,350 $12,254
211,274
kWh
- - - -
02 2.7134: Use photocell controls $1,443 $4,790 $650
11,211
kWh
$793
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,611 $7,298 $707
12,191
kWh
$904
-
kW-mo/yr
- - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $23,198 $23,580 - - - $9,439
-
MMBtu
$13,759
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $24,343 $31,350 - - - $9,905
-
MMBtu
$14,438
-
MMBtu
06 2.3212: Optimize plant power factor $13,258 $16,892 - - $13,258 - -
TOTAL RECOMMENDED $76,107 $85,260 $13,611
234,676
kWh
$1,697
-
kW-mo/yr
$13,258 $19,344
-
MMBtu
$28,197
-
MMBtu
TOTAL IMPLEMENTED $12,254 $1,350 $12,254
211,274
kWh
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs