ITAC Assessment: OK0949
ITAC logo
ITAC Assessment: OK0949
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Coated aluminum, smart levels
NAICS 332510: Hardware Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 300,000
ft2
Annual Production 500,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $268,076 4,813,498
kWh
Electricity Demand $79,626 13,727
kW-mo/yr
Natural Gas $92,264 24,039
MMBtu
Waste Disposal Costs
Water Usage $97,000 13,193
Tgal
TOTAL YEARLY COSTS $536,966
RECOMMENDED SAVINGS* $131,590 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.2622: Replace existing chiller with high efficiency model $17,826 $50,400 $14,903
266,129
kWh
$2,923
-
kW-mo/yr
- - -
02 2.2614: Use cooling tower or economizer to replace chiller cooling $5,613 $3,847 $5,613
100,236
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,319 $5,020 $1,319
23,559
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $720 $1,313 $720
12,854
kWh
- - - -
05 2.1212: Operate boilers on high fire setting $10,228 $44,000 - - - $10,228
-
MMBtu
-
06 2.2514: Cover open tanks $9,702 $850 - - - $9,702
-
MMBtu
-
07 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $74,759 $284,084 $117,411
2,096,640
kWh
$19,488
-
kW-mo/yr
- $(-41,174.0)
-
MMBtu
$(-20,966.0)
08 2.3212: Optimize plant power factor $11,423 $30,600 - - $11,423 - -
TOTAL RECOMMENDED $131,590 $420,114 $139,966
2,499,418
kWh
$22,411
-
kW-mo/yr
$11,423 $(-21,244.0)
-
MMBtu
$(-20,966.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs