Assessment Year | 2016 |
---|---|
Principal Product | Unlaminated plastics profile shape manufacturing |
NAICS | 326121: Unlaminated Plastics Profile Shape Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 320 |
Plant Area |
450,000
ft2
|
Annual Production | 43,000,000
lb
|
Production Hrs. Annual | 8,088
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,352,389 | 33,717,000 |
kWh
|
$0.040 |
Electricity Demand | $1,005,607 | 60,665 |
kW-mo/yr
|
$16.58 |
Natural Gas | $30,956 | 3,706 |
MMBtu
|
$8.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $253,412 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $197,283 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $27,456 | $25,000 |
$27,456
684,528
kWh
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,615 | $915 |
$8,615
214,781
kWh
|
- | - | |
03 | 2.2525: Eliminate cooling of process streams which subsequently must be heated and vice versa | $134,039 | $1,300 |
$85,245
2,125,279
kWh
|
$48,794
-
kW-mo/yr
|
- | |
04 | 2.2511: Insulate bare equipment | $63,243 | $3,161 |
$40,706
958,238
kWh
|
$22,537
-
kW-mo/yr
|
- | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $11,990 | - | - | - | $11,990 | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,069 | $10,000 | - | - | $8,069 | |
TOTAL RECOMMENDED | $253,412 | $40,376 |
$162,022
3,982,826
kWh
|
$71,332
-
kW-mo/yr
|
$20,059 | ||
TOTAL IMPLEMENTED | $197,283 | $4,461 |
$125,951
3,083,517
kWh
|
$71,332
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs