ITAC Assessment: OK0934
ITAC logo
ITAC Assessment: OK0934
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Unlaminated plastics profile shape manufacturing
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 320
Plant Area 450,000
ft2
Annual Production 43,000,000
lb
Production Hrs. Annual 8,088
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,352,389 33,717,000
kWh
Electricity Demand $1,005,607 60,665
kW-mo/yr
Natural Gas $30,956 3,706
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $253,412 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $197,283

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $27,456 $25,000 $27,456
684,528
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,615 $915 $8,615
214,781
kWh
- -
03 2.2525: Eliminate cooling of process streams which subsequently must be heated and vice versa $134,039 $1,300 $85,245
2,125,279
kWh
$48,794
-
kW-mo/yr
-
04 2.2511: Insulate bare equipment $63,243 $3,161 $40,706
958,238
kWh
$22,537
-
kW-mo/yr
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,990 - - - $11,990
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,069 $10,000 - - $8,069
TOTAL RECOMMENDED $253,412 $40,376 $162,022
3,982,826
kWh
$71,332
-
kW-mo/yr
$20,059
TOTAL IMPLEMENTED $197,283 $4,461 $125,951
3,083,517
kWh
$71,332
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs