ITAC Assessment: OK0917
ITAC logo
ITAC Assessment: OK0917
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Fiberglass Tanks
NAICS 325991: Custom Compounding of Purchased Resins
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 152,739
ft2
Annual Production 175
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,868 946,880
kWh
Electricity Demand $28,233 3,175
kW-mo/yr
Electricity Fees $8,706 -
Natural Gas $63,217 8,657
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,144 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,125

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,019 $6,287 $3,579
75,498
kWh
$3,440
-
kW-mo/yr
- - -
02 2.8121: Apply for tax-free status for energy purchases $4,154 $72 - - - - $4,154
03 2.4239: Eliminate or reduce compressed air usage $537 $55 $537
11,320
kWh
- - - -
04 3.4111: Use closed cycle process to minimize waste water production $4,875 $2,000 - - - $4,875
-
Tgal
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $689 $577 $689
14,545
kWh
- - - -
06 2.2211: Use optimum temperature $8,870 $180 - - $8,870
-
MMBtu
- -
TOTAL RECOMMENDED $26,144 $9,171 $4,805
101,363
kWh
$3,440
-
kW-mo/yr
$8,870
-
MMBtu
$4,875
-
Tgal
$4,154
TOTAL IMPLEMENTED $19,125 $2,884 $1,226
25,865
kWh
- $8,870
-
MMBtu
$4,875
-
Tgal
$4,154
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs