Assessment Year | 2015 |
---|---|
Principal Product | Extruded Plastic Conduit |
NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
SIC | 3084: Plastics Pipe |
Sales Range | $1 M to 5M |
# of Employees | 40 |
Plant Area |
80,000
ft2
|
Annual Production | 2,600,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $742,237 | 11,049,000 |
kWh
|
$0.067 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $85,580 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,343 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7211: Clean and maintain refrigerant condensers and towers | $12,740 | - |
$14,189
211,783
kWh
|
- | $(-1,449.0) | |
02 | 2.2622: Replace existing chiller with high efficiency model | $16,433 | $20,074 |
$16,433
248,976
kWh
|
- | - | |
03 | 2.2628: Utilize a less expensive cooling method | $30,382 | - |
$30,382
460,380
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,579 | $3,451 |
$2,579
38,495
kWh
|
- | - | |
05 | 2.7135: Install occupancy sensors | $390 | $1,805 |
$390
5,821
kWh
|
- | - | |
06 | 2.7122: Disconnect ballasts | $2,547 | $2,064 |
$2,547
38,018
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,606 | $5,687 |
$3,606
53,821
kWh
|
- | - | |
08 | 2.3212: Optimize plant power factor | $3,788 | $26,134 | - | $3,788 | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,642 | $1,150 |
$1,642
24,506
kWh
|
- | - | |
10 | 2.2511: Insulate bare equipment | $11,269 | $12,672 |
$11,269
168,191
kWh
|
- | - | |
11 | 2.6232: Install set-back timers | $204 | $23 |
$204
3,086
kWh
|
- | - | |
TOTAL RECOMMENDED | $85,580 | $73,060 |
$83,241
1,253,077
kWh
|
$3,788 | $(-1,449.0) | ||
TOTAL IMPLEMENTED | $47,343 | $4,601 |
$48,792
735,164
kWh
|
- | $(-1,449.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs