ITAC Assessment: OK0916
ITAC logo
ITAC Assessment: OK0916
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Extruded Plastic Conduit
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 80,000
ft2
Annual Production 2,600,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $742,237 11,049,000
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,580 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,343

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Administrative Changes Savings
01 2.7211: Clean and maintain refrigerant condensers and towers $12,740 - $14,189
211,783
kWh
- $(-1,449.0)
02 2.2622: Replace existing chiller with high efficiency model $16,433 $20,074 $16,433
248,976
kWh
- -
03 2.2628: Utilize a less expensive cooling method $30,382 - $30,382
460,380
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,579 $3,451 $2,579
38,495
kWh
- -
05 2.7135: Install occupancy sensors $390 $1,805 $390
5,821
kWh
- -
06 2.7122: Disconnect ballasts $2,547 $2,064 $2,547
38,018
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,606 $5,687 $3,606
53,821
kWh
- -
08 2.3212: Optimize plant power factor $3,788 $26,134 - $3,788 -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,642 $1,150 $1,642
24,506
kWh
- -
10 2.2511: Insulate bare equipment $11,269 $12,672 $11,269
168,191
kWh
- -
11 2.6232: Install set-back timers $204 $23 $204
3,086
kWh
- -
TOTAL RECOMMENDED $85,580 $73,060 $83,241
1,253,077
kWh
$3,788 $(-1,449.0)
TOTAL IMPLEMENTED $47,343 $4,601 $48,792
735,164
kWh
- $(-1,449.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs