Assessment Year | 2015 |
---|---|
Principal Product | Medium Density Fiberboards |
NAICS | 322130: Paperboard Mills |
SIC | 2631: Paperboard Mills |
Sales Range | $1 M to 5M |
# of Employees | 131 |
Plant Area |
167,760
ft2
|
Annual Production | 70,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,862,872 | 33,265,570 |
kWh
|
$0.056 |
Electricity Demand | $88,412 | 76,217 |
kW-mo/yr
|
$1.16 |
Natural Gas | $1,673,972 | 378,326 |
MMBtu
|
$4.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $683,804 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,424 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Wood Savings | Water Disposal Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1116: Improve combustion control capability | $14,334 | $41,000 | - | - |
$14,334
-
MMBtu
|
- | - | - | |
02 | 2.2135: Repair and eliminate steam leaks | $7,790 | $400 | - | - |
$7,790
-
MMBtu
|
- | - | - | |
03 | 2.2136: Install / repair insulation on steam lines | $12,634 | $2,848 | - | - |
$12,634
-
MMBtu
|
- | - | - | |
04 | 2.1224: Replace boiler | $501,021 | $1,650,000 | - | - |
$611,021
-
MMBtu
|
$(-110,000.0)
-
MMBtu
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,030 | $3,797 |
$1,030
17,303
kWh
|
- | - | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,343 | $37,638 |
$9,014
160,967
kWh
|
$329
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,129 | $4,880 |
$1,129
20,153
kWh
|
- | - | - | - | - | |
08 | 3.4151: Minimize water usage | $136,438 | $968,000 | - | - | - | - |
$97,456
-
Tgal
|
$38,982
-
Tgal
|
|
09 | 2.6211: Conserve energy by efficient use of vending machines | $85 | $420 |
$85
1,508
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $683,804 | $2,708,983 |
$11,258
199,931
kWh
|
$329
-
kW-mo/yr
|
$645,779
-
MMBtu
|
$(-110,000.0)
-
MMBtu
|
$97,456
-
Tgal
|
$38,982
-
Tgal
|
||
TOTAL IMPLEMENTED | $20,424 | $3,248 | - | - |
$20,424
-
MMBtu
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Wood Savings | Water Disposal Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs